For years Hosur Road was shorthand for Bengaluru's worst commute: a national highway carrying lakhs of IT and factory workers with no rail alternative. That changed when the Yellow Line opened. Understanding what the corridor now offers — and where the bottlenecks remain — is essential for anyone buying in the south.
Quick answer
Hosur Road (NH-44) is Bengaluru''s southern corridor, served by the Electronic City elevated expressway, the six-lane national highway towards Hosur, and since 2025 the Namma Metro Yellow Line between RV Road and Bommasandra. It links Silk Board, Bommanahalli, Kudlu, Electronic City and Bommasandra to central Bengaluru.
Introduction
Key takeaways
- Highway
- NH-44 with Electronic City elevated expressway
- Metro
- Yellow Line, RV Road to Bommasandra, operational
- Employment
- IT in Electronic City, industry in Bommasandra and Jigani
- Rental depth
- Strong across multiple price points
- Main bottleneck
- Central Silk Board and surface junctions
- Upcoming
- Blue Line interchange at Central Silk Board
Project status
Highway and elevated expressway operational; Yellow Line metro operational
Status reflects the latest publicly available information from the implementing authority. Proposed and approved stages are not the same as construction or operation — PropertyVest does not present a proposal as confirmed.
Quick facts
| Project | Hosur Road Development |
|---|---|
| Type | Highway corridor with metro and elevated expressway |
| Location | South Bengaluru — Silk Board to Bommasandra / Hosur |
| Approx. length | Not publicly confirmed |
| Corridors | NH-44, Electronic City elevated expressway, Metro Yellow Line |
| Stations | Not publicly confirmed |
| Current status | Highway and elevated expressway operational; Yellow Line metro operational |
| Authority | NHAI, BMRCL, BBMP |
| Expected timeline | Operational; further junction and ORR works ongoing |
| Last updated | 4 October 2026 |
What is Hosur Road Development?
Hosur Road is part of NH-44 and functions as both a national highway and a daily commuter artery. Its defining pieces of infrastructure are the Electronic City elevated expressway, which allows through traffic to bypass congested surface junctions, the widened highway south towards Attibele and Hosur across the Tamil Nadu border, and the Namma Metro Yellow Line, which opened in 2025 between RV Road and Bommasandra.
The corridor''s economic base is unusually broad for Bengaluru. Electronic City Phases 1 and 2 hold major IT campuses; Bommasandra and Jigani carry industrial, pharmaceutical and manufacturing employment; and the Attibele–Hosur belt across the border adds automotive and electronics manufacturing. That mix means demand comes from both salaried IT tenants and industrial staff, giving the rental market unusual depth at multiple price points.
The remaining pain points are the Central Silk Board junction — where the ORR, Hosur Road and metro corridors converge — and surface-level congestion at Bommanahalli and Hosa Road during peak hours. The Yellow Line materially reduces exposure to these for commuters willing to use it.
Route & coverage
From the city: Silk Board Junction – Bommanahalli – Hongasandra – Kudlu Gate – Singasandra – Hosa Road – Beratena Agrahara – Electronic City (elevated expressway above the surface road) – Konappana Agrahara – Hebbagodi – Bommasandra – Attibele – Hosur.
The Yellow Line metro runs alongside this alignment from RV Road via Jayadeva Hospital and Central Silk Board to Bommasandra, with an interchange at Central Silk Board for the under-construction Blue Line along the Outer Ring Road.
Stations, junctions & corridors
| Station / junction | Locality | Corridor | Notes |
|---|---|---|---|
| Central Silk Board | BTM Layout | Yellow Line | Interchange with Blue Line (under construction) |
| Bommanahalli | Bommanahalli | Yellow Line | Dense residential catchment |
| Kudlu Gate | Kudlu | Yellow Line | Affordable rental belt |
| Hosa Road | Hosa Road | Yellow Line | High tenant density |
| Electronic City | Electronic City | Yellow Line | Serves Phase 1 tech parks |
| Hebbagodi | Hebbagodi | Yellow Line | Industrial and residential mix |
| Bommasandra | Bommasandra | Yellow Line | Southern terminus, industrial belt |
Timeline
- 2010
Electronic City elevated expressway opens to traffic
Confirmed - 2010s
NH-44 widening and junction improvements towards Attibele and Hosur
Confirmed - 2025
Namma Metro Yellow Line opens from RV Road to Bommasandra
Confirmed - Ongoing
Blue Line construction at Central Silk Board and ORR junction improvements
In progress
Timelines for large infrastructure projects change. Entries labelled expected or reported are not guaranteed completion dates.
Real estate impact
Property prices
The Yellow Line''s opening was the corridor''s most significant value event in a decade. Projects within walking distance of stations at Hosa Road, Electronic City and Hebbagodi have seen the clearest improvement in buyer interest, since a rail commute removes the corridor''s historic weakness. Areas dependent purely on the surface road, particularly interior layouts off Begur and Chandapura, benefit less.
Rental market
Hosur Road has one of Bengaluru''s deepest rental markets. IT employees in Electronic City, industrial staff in Bommasandra and Jigani, and students and young professionals sustain demand for compact 1 and 2 BHK homes as well as sharing accommodation. Metro-adjacent stock generally achieves faster tenanting and lower vacancy.
Infrastructure may support prices, rentals and liquidity, but outcomes depend on delivery timelines, supply and broader market conditions. PropertyVest does not guarantee appreciation or returns.
Property price & rental context
Pricing along the corridor generally steps down from Bommanahalli and Kudlu towards Bommasandra and Attibele, with Electronic City sitting in the middle and commanding a premium near metro stations. PropertyVest publishes per-project pricing only where a developer price sheet or RERA filing confirms it.
Localities connected to Hosur Road Development
- Electronic City
- bommanahalli
- hosa-road
- bommasandra
- btm-layout
Projects in areas connected to this infrastructure

Ramky Lumina
Ramky Group · Hosa Road
- Configurations: 1 BHK, 2 BHK, 3 BHK
- Price: ₹0.75 Cr
- RERA: PRM/KA/RERA/1251/310/PR/250304/000047
- Status: New Launch

Habulus Oasis Grove
Habulus Groups · Electronic City
- Configurations: Details being verified
- Price: ₹1.13 Cr
- RERA: Details being verified
- Status: New Launch
Orchid South Park
Goyal & Co · Electronic City
- Configurations: Details being verified
- Price: ₹1.44 Cr
- RERA: PRM/KA/RERA/1251/308/PR/060526/008625
- Status: New Launch
Habulus Tranquil
Habulus Group · Electronic City
- Configurations: 2 BHK, 2.5 BHK, 3 BHK
- Price: ₹0.98 Cr
- RERA: PRM/KA/RERA/1251/310/PR/020126/008378
- Status: Under Construction
Investment outlook
How to buy on this corridor:
- Prioritise walkable metro access; it is the corridor''s single biggest differentiator now.
- For rental yield, compact configurations near Electronic City and Hosa Road perform best.
- Check which side of the highway the project sits on — crossing NH-44 during peak hours is a real daily cost.
- Verify RERA registration, and for Attibele and Hosur-side purchases check which state and authority governs the parcel.
Potential benefits
- Operational metro along the corridor since 2025
- Elevated expressway bypasses surface congestion
- Very deep and diverse rental tenant base
- Large IT and industrial employment within the corridor
- Affordable entry points towards Bommasandra and Attibele
Risks & considerations
- Central Silk Board and surface junctions remain congested
- Interior layouts off the highway gain little from metro
- Industrial proximity affects some pockets'' liveability
- Highway crossing adds real commute friction
- Attibele-side purchases involve cross-border jurisdiction checks
PropertyVest publishes risks alongside opportunity. Infrastructure timelines and property outcomes are not guaranteed.
Conclusion
With the Yellow Line running and the Blue Line being built to meet it at Central Silk Board, Hosur Road is shifting from Bengaluru''s most criticised commute to one of its better-connected corridors. Expect continued rental strength and steady end-user demand, with the sharpest differentiation between metro-walkable stock and everything else.
Frequently asked questions
Does metro serve Hosur Road and Electronic City?
Yes. The Namma Metro Yellow Line opened in 2025 between RV Road and Bommasandra, with stations including Hosa Road, Beratena Agrahara, Electronic City, Konappana Agrahara, Huskur Road, Hebbagodi and Bommasandra.
What is the Electronic City elevated expressway?
A tolled elevated road above Hosur Road that lets through traffic bypass surface junctions between Silk Board and Electronic City.
Is Hosur Road good for rental investment?
It has one of Bengaluru''s deepest rental markets, driven by Electronic City IT campuses and the Bommasandra and Jigani industrial belts. Compact homes near metro stations tenant fastest.
What are the main traffic problems on Hosur Road?
Central Silk Board junction, where the ORR and Hosur Road meet, plus surface congestion at Bommanahalli and Hosa Road during peak hours.
Which localities are on the Hosur Road corridor?
Bommanahalli, Hongasandra, Kudlu, Singasandra, Hosa Road, Begur, Electronic City Phases 1 and 2, Hebbagodi, Bommasandra, Chandapura and Attibele.
Will connectivity improve further?
Yes. The Blue Line along the Outer Ring Road is under construction and will interchange with the Yellow Line at Central Silk Board.
Sources & verification
Last verified: 8 September 2026
Not sure how this corridor affects the property you're considering?
Talk to a PropertyVest advisor for a locality-specific read on connectivity, pricing and rental demand.